EAPCI PVC CCGT combined cycle power plant H-25.
Gas turbine: H-25
boiler:
47.6t/h;3.82MPa;450Celsius;
8.1t/h; 0.1MPa;120Celsius.
Bespoke design, please contact us.
EAPCI CCGT combined cycle power plant H-25
SKU: P0008-0041
EAPCI PVC CCGT combined cycle power plant H-25.
Gas turbine: H-25
boiler:
47.6t/h;3.82MPa;450Celsius;
8.1t/h; 0.1MPa;120Celsius.
Bespoke design, please contact us.