top of page

Metallurgical industry waste heat recovery boiler CCGT PG6518-L.
Phase I:
70t/h; 3.82MPa;450Celsius.
Phase II:
69.8t/h; 6.87MPa;468Celsius;
13t/h; 0.59MPa;230celsius.

Bespoke design, please contact us.

Metallurgical industry waste heat recovery boiler CCGT PG6518-L

SKU: P0008-0045
    bottom of page